INFRASTRUCTURE

Global Strategy.
Grid-Integrated Execution.

Riveon builds compute, BESS and AI infrastructure for the global AI economy. Live in Finland today, with Sweden coming online — and a US expansion opportunity in Texas under evaluation.

Powered By GreenGridLabs

One Platform.
Grid-Integrated Everywhere.

A global platform for the AI economy — compute, BESS and AI hardware running as one integrated energy system. Live in Finland today, with Sweden coming online and the US under evaluation.

Finland Dalsbruk datacenter live · 18 MWh BESS (6 MWh installed) · Oulu in permitting
Sweden Söråker · 2 MWh BESS site under construction, pre-launch
USA Texas expansion opportunity · under evaluation
100% Renewable power across every operating site, complemented by BESS
Riveon Battery Energy Storage System

Global Ambition.
Grid-Smart Geography.

We go where power is cheap, clean and flexible. Today that means the Nordics — cool climate, abundant renewables, strong grid connectivity, and stable EU jurisdiction. Tomorrow: wherever power is competitive and grid access is strong.

Dalsbruk · Finland

Operational
  • Status: Datacenter live — operational
  • Power: Nordic grid, 100% renewable mix
  • BESS: 18 MWh BESS platform (6 MWh Huawei LUNA2000 installed and grid-connected) — commissioning underway
  • Heat recovery: Designed into the site — discussions with local off-takers ongoing
  • Connectivity: European IX access

Söråker · Sweden

Under construction · Pre-launch
  • Status: Under construction — pre-launch
  • Capacity: 2 MWh Battery Energy Storage System
  • Power: Swedish grid, 100% renewable mix
  • Energy role: Standalone BESS — grid-integrated by design
  • Jurisdiction: EU, full GDPR and ESG compliance

Oulu · Finland

Planned · permitting in process
  • Status: Expansion site, permit process ongoing
  • Power: Nordic grid, 100% renewable mix
  • Site: Industrial area > 10 ha
  • Heat recovery: District heating integration under study
  • Certification: Tier III+ design target

Texas · USA

Expansion opportunity · under evaluation
  • Status: US expansion opportunity currently being evaluated
  • Why Texas: Deep power markets, wind/solar abundance, grid-flex friendly
  • Focus: AI compute and BESS co-located with renewable generation
  • Stage: Site selection and partner dialogue

Enterprise-Grade
by Design.

Renewable Power

100% renewable power mix at every site, complemented by the group's battery storage assets. Long-term PPAs support stable, competitive energy pricing.

Liquid Cooling

Direct-to-chip liquid cooling enables high-density GPU deployments while maintaining optimal operating temperatures year-round.

Physical Security

24/7 on-site security, biometric access control, CCTV monitoring, and multi-layer perimeter protection.

Network

Multiple redundant fiber paths, direct peering with major EU exchanges, and sub-8ms latency to key European markets.

Infrastructure for the AI Economy.
Built to Last.

Explore Riveon’s compute, BESS and AI infrastructure — live in Finland today, with Sweden coming online and the US next on the roadmap.